scroll down
UA EN
Menu
Cherkasy Zoo. The second turn

Cherkasy Zoo. The second turn


2021

We’ve updated the territory of the zoo and made it even more beautiful and comfortable for visitors

Our work is an inclusive administrative building, a lake with a water purification system, external engineering
networks and general improvement of the territory. We arranged:


2 000 m2

The lake

2600 m2

The squares and tracks

500 m2

Renovated administrative building

Entrance area

The entrance area we’ve designed as a hole. This made it perfectly fit into the general concept of the Cherkasy Zoo.

Cherkasy Zoo. The second turn
Cherkasy Zoo. The second turn

Entrance area of Cherkasy Zoo, 2021

The lake as a main beauty of the zoo

At the zoo we’ve arranged a lake with a depth of up to 6 meters and with biological plates for swimming water birds and turtles. All other lakes and water basins of the zoo territory are integrated into the cascade water purification system.

Cherkasy Zoo. The second turn
Cherkasy Zoo. The second turn

The pond and its feathered owners, 2021

This lake is really special

For the smallest visitors, we have designed the "Skin of Vasilisk" and "Labyrinth" playgrounds. And for the comfort of adults there are amphitheatres, tracks, parking.

Cherkasy Zoo. The second turn
Cherkasy Zoo. The second turn

Children's playground in the zoo, 2021

We are grateful to photographer Ivan Avdeyenko for these pics.

More photos in the slideshow